Inspection Guide

NSPIRE Inspection Order

Recommended sequence for conducting NSPIRE inspections based on industry best practices, logical flow, and safety priorities. Follow this order to ensure efficient and thorough inspections.

Total Standards: 103
Last Updated: January 2026

Key Inspection Principles

Outside → Inside → UnitExterior to interior flow
Life-Safety FirstEmergency systems before routine items
Structural Before FinishesBuilding integrity before aesthetics
Systems Before FixturesMechanical/electrical before appliances
Room-by-RoomComplete each room before moving on
1

Phase 1: Exterior (Outside) Inspection

Assess property from outside, identify building envelope issues, and verify site conditions before entering the building

17 standards

Start here - helps identify property

Life-Threateningoutside
#2

Parking Lot Standard

Standardoutside
#3

Private Roads and Driveways Standard

Standardoutside
#4

Sidewalk, Walkway, and Ramp Standard

Standardoutside
#5

Roof Assembly Standard

Standardoutside
#6

Wall – Exterior Standard

Standardoutside
#7

Foundation Standard

Standardoutside
#8

Site Drainage Standard

Standardoutside
#9

Fire Escape Standard

High Priorityoutside
#10

Fence and Gate Standard

Standardoutside
#11

Retaining Wall Standard

Standardoutside
#12

Lighting – Exterior Standard

Standardoutside
#13

Drain Standard

Standardoutside
#14

Chimney Standard

Standardoutside
#15

Trip Hazard Standard

Standardoutside
#16

Fire Extinguisher Standard

Standardoutside
#17

Flammable and Combustible Item Standard

Standardoutside
2

Phase 2: Common Areas (Inside) Inspection

Inspect shared spaces, building systems, and common area safety features before entering individual units

35 standards
#18

Door – Entry Standard

Standardinside
#19

Door – Fire Labeled Standard

High Priorityinside
#20

Door – General Standard

Standardinside
#21

Egress Standard

High Priorityinside
#22

Exit Sign Standard

High Priorityinside
Life-Threateninginside
#24

Smoke Alarm Standard

Life-Threateninginside
#25

Carbon Monoxide Alarm Standard

Life-Threateninginside
#26

Fire Extinguisher Standard

High Priorityinside
#27

Sprinkler Assembly Standard

High Priorityinside
#28

Elevator Standard

Standardinside
#29

Lighting – Interior Standard

Standardinside
#30

Lighting – Auxiliary Standard

High Priorityinside
#31

Electrical – Service Panel Standard

Standardinside
#32

Electrical – GFCI or AFCI – Outlet or Breaker Standard

High Priorityinside
#33

Electrical – Conductor, Outlet, and Switch

Standardinside
#34

Floor Standard

Standardinside
#35

Wall – Interior Standard

Standardinside
#36

Ceiling Standard

Standardinside
#37

Steps and Stairs Standard

High Priorityinside
#38

Handrail Standard

High Priorityinside
#39

Guardrail Standard

High Priorityinside
#40

Heating, Ventilation, and Air Conditioning (HVAC) Standard

Standardinside
#41

Ventilation

Standardinside
#42

Drain Standard

Standardinside
#43

Leak – Water

Standardinside
#44

Leak – Gas or Oil

Life-Threateninginside
#45

Leak – Sewage System

Life-Threateninginside
#46

Mold-Like Substance Standard

Standardinside
#47

Infestation Standard

Standardinside
#48

Litter Standard

Standardinside
#49

Trip Hazard Standard

Standardinside
#50

Sharp Edges Standard

Standardinside
#51

Structural System Standard

Standardinside
#52

Trash Chute Standard

Standardinside
3

Phase 3: Unit Inspection

Inspect individual dwelling units systematically, room by room, ensuring all standards are evaluated

51 standards across 11 sections

Unit Entry and Safety Systems (First Priority - Life Safety)

4 standards+

Unit Entry and Security

4 standards+

Unit Electrical Systems

5 standards+

Unit Structural Elements

6 standards+

Unit Plumbing and Water Systems

8 standards+

Unit HVAC and Ventilation

3 standards+

Unit Kitchen

5 standards+

Unit Bathroom

6 standards+

Unit Laundry (If Applicable)

2 standards+

Unit Hazards and Conditions

6 standards+

Unit Chimney and Fire Safety (If Applicable)

2 standards+

Special Considerations

⚠️ Life-Threatening (24-Hour Correction)

  • Call-for-Aid System Standard
  • Smoke Alarm Standard
  • Carbon Monoxide Alarm Standard
  • Leak – Gas or Oil
  • Leak – Sewage System

✓ Affirmative Habitability Requirements

  • Food Storage Space (Cabinet and Storage - Unit only)
  • Minimum Electrical and Lighting (Unit)
  • Egress (Unit/Inside)

🔧 Requires Testing

  • Call-for-Aid System
  • Smoke Alarm
  • Carbon Monoxide Alarm
  • Bathtub and Shower
  • Toilet
  • Sink
  • +4 more

📏 Requires Measurement

  • Call-for-Aid System (pull cord height - must be ≤6 inches)
  • Cabinet and Storage (percentage calculation - 50% threshold)
  • Egress (window/door size requirements)
103
Total Standards
11
Life-Threatening
16
High Priority
3
Inspection Phases